Build Time
5 weeks
Services provided
- CAD design and kitchen layout
- Planning & technical advice
- Extraction system
- HVAC and Air handling systems
- Bespoke stainless steel fabrications
- Bar fabrications
- New commercial catering appliances
Key brands used
- Bioclad Upvc hygienic wall cladding
- Maidaid dishwasher
- Polyflor Flooring
- Blue Seal
- Lincat accelerated cooking
- Samsung
More about this project
Canterbury’s ‘Cathedral of Sport’ is here! Redefining how you watch, play, party, eat & drink with 27 Ultra HD screens for the ultimate sports viewing experience alongside a lineup of entertainment including three interactive darts, three cashless pool tables, shuffleboard, karaoke and private-hire rooms.
Already having a business relationship with Matches in Ashford helped us win the deign and build of this new Canterbury city centre venue.
Over a 6 week period we refurbished the commercial kitchen using a mix of new equipment and used which the client already owned and just needed servicing.
We completed Upvc wall installation and slip resistant vinyl layinng to the kitchen area along with the installation of a suspended ceiling.
Major work in the building involved a full kitchen extract system, installation of HVAC and air handling systems and a both a cellar cooler and server room cooler, all of which was complicated by the nature of the building with us needing to get 12 remote units on to the roof.
Just as we were ready to complete the job our client was let down by another contractor who was due to complete the back bar fitout just 3 days before opening.
Working closely with our excellent stainless steel fabricator we managed to desin and install two bars totalling 15m in length just in time!
A complicated job with challenging conditions being city centre but now a well established and successful Canterbury sports bar.