Ashford International Hotel
Who we worked with:
Ashford International hotel
Location:
Ashford, Kent
Build Time
2 weeks
Services provided
- CAD design
- Planning & technical advice
- Bespoke stainless steel fabrications
- Suspended ceiling system
- Upvc hygienic wall cladding
- Slip resistant vinyl flooring
- Electrical and plumbing works
Key brands used
- Winterhalter Dishwashing
- Altro Flooring
- Bioclad Hygienic Walls
More about this project
The Ashford International Hotel required a replacement for their aged and failing flight dishwasher which had done many years of good service but was now failing on a regular basis causing considerable repair costs.
As the replacement machine was a special order item from Winterhalter in Germany we set the customer up with a temporary dishwasher room and a pass-through dishwasher that we lent then for the duration.
The new machine had a 6 week lead time which gave the hotel the opportunity to refurbish the area the old machine was located in.
We stripped out the machine then created a temporary ply wall so that refurbishment works would not interfere with the working kitchen just feet away,
The room was Upvc clad, received Altro slip-resistant flooring, a suspended ceiling along with a re-wire and new plumbing in readiness for the new dishwasher.
Once the dishwasher was delivered we were able to install it and it along with new stainless steel tabling over a two day period followed by some staff training.
Client's Testimonial
Very happy to have used Kent Commercial Kitchens for this project. They knew what they were doing from the start and were very helpful throughout the build.