Wye School Kitchen Design, Kent
Who we worked with:
Rydens, United Learning & Wye School
Location:
Wye, Kent
Build Time
3 weeks
Services provided
Key brands used
More about this project
π½οΈ Wye School β Kitchen Refurbishment
Modernising a School Kitchen for a Growing Student Body
π Project Overview β Supporting Growth and Efficiency
π« About the School
Wye School sits in the village of Wye near Ashford, Kent, and serves students aged 11β18. As the student numbers grew, the existing kitchen could not handle meal preparation efficiently. Therefore, we planned a full refurbishment, and we also prepared for future expansion. Previously, we upgraded a temporary kitchen, so we already understood the site. Consequently, the school asked us to renovate their main kitchen fully, and as a result, they now have a modern, safe, and efficient space that meets current and future needs.
π Project Goals
The school wanted a kitchen that served more students while improving safety and workflow. Therefore, we designed surfaces that staff could clean easily, and we increased meal service capacity at the same time. We scheduled all work during the summer holidays to avoid disrupting school operations, and consequently, the school could continue normal activities. Additionally, we positioned appliances and workstations strategically so staff could work efficiently, and as a result, the new layout supports productivity, safety, and future catering requirements.
π§ Kitchen Refurbishment β Safe, Efficient, and Practical
First, we installed a new extraction canopy to remove cooking odors, and therefore, the kitchen remained comfortable and safe. At the same time, we laid slip-resistant vinyl flooring to prevent slips during busy periods, and also to protect staff. Furthermore, we applied Whiterock UPVC wall cladding to create smooth, easy-to-clean surfaces, so hygiene standards meet strict school requirements.
Next, we upgraded cooking appliances, including Blue Seal and Rational units, so staff could prepare larger meal volumes efficiently, and at the same time, reduce cooking times. Meanwhile, we added a Maidaid Minrack conveyor dishwasher with EPAS grease removal, which sped up dishwashing, and therefore, reduced staff workload. In addition, we installed new servery hot cupboards to keep meals hot and ready, and consequently, meal service became faster and more organised. Overall, staff now operate safely, efficiently, and smoothly even during peak lunch periods.
π Project Outcome β Ready for the New School Year
We finished the refurbishment on time, one week before term started, and therefore, staff had enough time for training, restocking, and final checks. Consequently, Wye School now enjoys better workflow, improved food safety, faster meal service, and durable, easy-to-clean surfaces. Moreover, the kitchen is modern, safe, and efficient, and therefore, the school can serve high-quality meals every day while preparing for future growth.
π Ready to Upgrade Your Kitchen?
If you want to refurbish or upgrade a school kitchen, we can guide you from start to finish, and therefore, you can create a space that is safe, efficient, and future-ready. Consequently, call 01304 249963 today to discuss your project, and we will provide expert advice on design, installation, and equipment.
πΈ See Project Photos Below!
Scroll down to view how Wye Schoolβs kitchen transformed into a modern, efficient, and safe foodservice hub.