Dundonald Church Hall

Who we worked with:

Dundonald Church & Curo Construction

Location:

Wimbledon, Greater London

Build Time

5 Weeks

Services provided

  • CAD design
  • Hygienic wall cladding
  • Extract canopy
  • New catering appliances
  • Stainless steel fabrications

Key brands used

  • Foster
  • Rational
  • Blue Seal
  • Bioclad
  • CED
  • Marco
  • Instanta
  • Classeq

More about this project

A long established old building ‘The Factory’ that was no longer fit for purpose and in need of significant renovation. After seeking professional advice it was decided that the best option was to replace it with a purpose-built facility. Kent Commercial Kitchens were contracted to provide a new commercial kitchen into the new building.

Our works started with a design consultation between ourselves, the main contractor and the end user client.
Once a suitable design layout was agreed works were carried out by our experienced team of commercial kitchen fitters over a number of months whilst waiting for other elements of the new build to complete.

Our team supplied the extract canopy and completed Upvc hygienic wall cladding before installing stainless steel work benches, sinks and a range of commercial catering equipment, refrigeration, beverage machines and dishwashing equipment.

Project Image Gallery

Client's Testimonial

“As a result of KCK’s extensive experience the layout & fit out of our new kitchen is perfect for our needs. Their team has always been quick in responding to our questions and have taken the time to explain things in way that we non-professionals can understand. I have no hesitation in recommending them.”

Emily, Centre Manager