Case study · Food production · Chatham, Kent

Condimaniac CPU, Chatham

Full fit-out of a dual-zone central production unit for a fast-growing Kent condiment brand, delivered as main and sole contractor in five weeks.
SectorFood production, CPU
LocationChatham, Medway
Project valueUnder £50k
Programme5 weeks
Our roleMain and sole contractor
The brief

Two production rooms, one unit, no cross-contact

Condimaniac is a fast-growing Kent condiment brand, and Chatham is where its production moved. The brief was a full fit-out of a dual-zone central production unit: a wet sauce room and a dry spice room, with allergen-safe separation between them, plus extraction, cladding, electrical and plumbing. We were main and sole contractor, so the whole thing was ours.

Central production units are their own discipline. As a category they are high-volume, HACCP-critical environments serving multiple outlets, and the design questions across the sector are bulk production workflows, blast chilling, regeneration and distribution logistics rather than covers per service. Whatever the mix on a given site, a CPU is built around what leaves the building, not around a dining room.

Hygienic wall cladding lining the food production room at the Condimaniac CPU in Chatham
Hygienic cladding through the food room, wipe-clean and sealed at the joints.
Supply air ductwork installed above the production rooms at the Condimaniac CPU in Chatham
Supply air ductwork, sized for the two zones separately.
The difficulty

Two rooms with opposite requirements, sharing one building

The hard part of this job was the ventilation, and the reason is the pairing of rooms. Wet sauce production puts heat and moisture into the air. Dry spice handling puts fine airborne particulate into it. Neither can be allowed to reach the other, because cross-contact between a spice room and a sauce room is an allergen control failure rather than a housekeeping problem, and in a HACCP environment that is the whole point of the layout.

Ordinary commercial kitchen extraction pulls hard, and pulling hard is exactly wrong in a dry spice room. High air velocity lifts powder off benches and out of open containers, moves it around the room and, if the air balance is not right, carries it through the doorway into the next one. Under-ventilate instead and the sauce room fills with steam, condensation runs on the surfaces and the room stops being cleanable. So the specification had to move enough air to keep each room's own conditions under control, at low enough pressure and velocity not to disturb the product, and with the balance between the two zones set so that air never travels from one into the other.

That is why the ventilation here is specialist low-pressure rather than standard kitchen extraction. The separation between the zones is delivered by the air as much as by the wall between them, so the fans, the ductwork and the supply air all have to be designed as one system with the room layout, not added to it afterwards.

What we did

Main and sole contractor, every trade our own

We delivered the full fit-out as main and sole contractor: sauce room, spice room, extraction, cladding, electrical and plumbing. Design was by our CFSP-accredited directors, and because the ventilation, the room construction and the finishes were all ours, the air strategy and the layout were decided together rather than argued about between companies. For a brand that is growing, a single point of responsibility also means one programme, one set of drawings and one number to ring.

Wet sauce roomBuilt for heat and moisture, with surfaces and services that stay cleanable in a wet environment.
Dry spice roomKept dry and kept still, so airborne particulate is not moved around by the ventilation.
Specialist low-pressure ventilationExtraction and supply air designed for two zones, balanced so air does not pass between them.
Hygienic claddingWall and ceiling finishes taken through both rooms, sealed and wipe-clean for a HACCP environment.
Electrical and plumbingPower, water and drainage installed to suit two rooms doing very different work.
One contractorMain and sole contractor, with no subcontract chain and one point of responsibility.
The result

Five weeks, under £50k, two zones that stay separate

Delivered in five weeks for under £50k, as main and sole contractor. Condimaniac's Chatham CPU runs a wet sauce room and a dry spice room in the same unit, with allergen-safe separation between them held by specialist low-pressure ventilation as well as by the layout.

Our other sectors page covers production facilities and specialist installations, and our Medway Towns page lists other projects in Chatham, Gillingham and Rochester.

Planning a production unit

If allergen separation is part of the brief, the ventilation has to be designed with the layout. We survey first, then design to it. Kent and the South East, 21+ years, every trade in-house.