Seaside cafe kitchen refurbishment — this case study by Kent Commercial Kitchens.
Case study · Restaurants & cafés
Deal Pier Kitchen, Deal
Seaside cafe kitchen refurbishment — Specifically, Full kitchen refurbishment for an iconic seaside venue at the end of Deal Pier — extraction, hygienic finishes, equipment fit-out, and 350 metres of pier logistics, delivered in 4 weeks.
Client
Deal Pier Kitchen
Location
Deal, Kent
Project value
£50k–£100k
Build time
4 weeks
The brief
Seaside cafe kitchen refurbishment: Reopening a Kent landmark
Additionally, Deal Pier Kitchen sits at the seaward end of Deal's 1950s pier — one of the most recognisable venues on the Kent coast. Furthermore, After the venue had been closed for over a year, new owners Tim and Rebecca took it on with a plan to reopen it as a modern café and restaurant. Moreover, We had previously worked on the site, which meant we could move quickly and plan around the known constraints of the building.
Also, The brief was a full kitchen refurbishment to bring the space up to a professional standard: extraction, compliant finishes throughout, a full equipment fit-out, bar design and build, and all M&E works. In particular, The pier location added a logistical challenge — every piece of equipment had to be carried 350 metres along the pier on foot. Notably, All works delivered in 4 weeks.
What we did
Full refurbishment, 350 metres from the road
Extraction and fire suppression
Therefore, A cafe kitchen refurbishment Kent for Deal.
Specifically, new extraction canopy installed over the cookline, with ductwork routed through the pier structure. In particular, ceasefire wet-chemical fire suppression system fitted alongside — a requirement for a kitchen at this scale operating in an enclosed pier building. Also, ePAS grease management system installed on the extraction run.
Hygienic finishes and ceiling
Additionally, bioclad UPVC hygienic wall cladding throughout the kitchen. In particular, altro slip-resistant safety flooring laid and coved at all wall junctions. Also, wipeable suspended ceiling with lighting — bright, clean and straightforward to maintain for a venue running breakfast through evening service.
Bar design and build
Furthermore, new bar carcasses designed and fabricated at our Folkestone workshop, transported to Deal and installed on site. In particular, completed with a bespoke worktop finish to complement the venue's coastal aesthetic.
Equipment supply and install
Moreover, full catering line supplied and installed: Rational SCC combi oven, Blue Seal gas range and salamander, Foster undercounter refrigeration, Maidaid pass-through dishwasher. In particular, every appliance commissioned and signed off before handover. Also, all electrical, gas and plumbing works carried out by our in-house team.
350-metre pier logistics
Also, no vehicle access beyond the pier entrance. In particular, every item of equipment, every length of ductwork, every sheet of cladding was carried 350 metres along the pier by our team. Also, the programme was planned around the carry distance from the outset — sequencing deliveries to keep the pier clear and the build moving. Therefore, delivered on time regardless.
Equipment specified
Café and restaurant grade throughout
- Rational SCC combi oven — production cooking
- Blue Seal gas range and salamander — main cooking line
- Foster undercounter refrigeration — working cold storage
- Maidaid pass-through dishwasher — warewashing at service pace
- Ceasefire wet-chemical fire suppression — extraction system
- EPAS grease management — extraction run
- Bioclad UPVC hygienic wall cladding
- Altro slip-resistant safety flooring
The installation
Inside the completed kitchen




Foster refrigeration at Deal Pier Kitchen" loading="lazy">


The outcome
Reopened and trading
Consequently, Deal Pier Kitchen was handed over within the 4-week programme, fully equipped and operational. Indeed, The new owners Tim and Rebecca reopened the venue with a modern kitchen capable of running breakfast through evening service, with finishes and systems that meet current food safety and fire safety requirements. Importantly, A second project on a site we know well — direct appointment, no tender process.
- CEDA Member The Catering Equipment Distributors Association — UK's voice for foodservice equipment specialists.
- ISO 9001 · 14001 · 45001 Certified The only Kent commercial kitchen design-and-install firm certified to all three.
- F-Gas Certified Certified to handle and install refrigerants in commercial refrigeration and cooling equipment.
- Gas Safe Registered All commercial gas installations carried out by Gas Safe registered engineers.
- Part of Advantage Catering Equipment Kent's design, supply and service specialists since 2003.